Building projects; online submission of the criteria catalogue

Service content

  • Description of the

    The list of criteria covers various points that are relevant to the assessment of the structural stability of the planned project. For certain projects, the structural engineer may declare that all the points set out in the list of criteria have been met. In such cases, the otherwise required certification of the stability analysis by a structural stability expert, or the verification of stability by the local building control authority, a structural engineer or a testing body, is not necessary. However, the declaration confirming compliance with the list of criteria must be submitted.

    The submission of the declaration confirming compliance with the list of criteria is not a separate procedure, but must always be carried out in conjunction with other procedures. Depending on the specific building project, it must be submitted either as part of the building application or as an annex to the notification of commencement of works.

    However, it can be submitted online directly by the structural engineer to accompany digitally submitted planning applications and notifications of the start of works.

  • Prerequisites

    Where buildings in building classes 1 to 3, as well as tanks, bridges, retaining walls, grandstands and other structures with a clear height of more than 10 metres that are not buildings, meet all the criteria set out in the criteria catalogue, there is no requirement for a certificate of structural stability issued by a structural stability inspector, nor for a structural stability assessment to be carried out by the local building control authority, a structural engineer or a testing body.

    However, this requires the submission of a declaration confirming compliance with the list of criteria, issued by a qualified structural engineer – usually the person who prepared the structural stability analysis.

    If the building project involves a special-purpose building, the declaration must be submitted at the same time as the planning application. Otherwise, it is sufficient to submit it with the notification of commencement of works.

    Notwithstanding the above, however, it is not necessary to submit the declaration in the case of residential buildings in building classes 1 and 2, or single-storey above-ground buildings with clear spans of no more than 12 m and a floor area of no more than 1 600 m², which are not intended for habitation or are intended only for the temporary occupation of individual persons.

  • Costs

    There are no additional costs involved in submitting the declaration regarding the list of criteria.

  • Legal basis

  • Legal remedy

    Submitting the list of criteria does not constitute an application. Consequently, no separate decision will be issued by the lower building control authority against which you could take action.

  • Further links

  • Procedure

    Digital submission

    It is not yet possible to submit the declaration of compliance with the criteria online throughout Bavaria. When a location is selected, the link to the online procedure will appear, provided that this service is already available.

    • The structural engineer who prepared the structural stability analysis may submit the declaration of compliance with the criteria list digitally using the online wizard.
    • The standard form ‘Declaration of Compliance with the Criteria’ is replaced by the questions in the online wizard.
    • The signature is replaced by authentication via the ‘BayernID’ or ‘Mein Unternehmenskonto’ user account.

    To enable the lower-level building control authority to link the submission to the digital building application or the digital notification of commencement of works, it is necessary to provide the reference number that was given to the applicant when the digital building application or the digital notification of commencement of works was submitted.

  • Notes

    The declaration confirming compliance with the list of criteria is not a separate application; depending on the project, it must be submitted either with the planning application or with the notification of commencement of works.

Please note that the texts on the services are published by the Bavarian State Ministry for Digital Affairs and can only be supplemented by us.

Responsible departments

Help with accessibility

  • General

    We endeavour to make our website accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view

Select language