Diese Seite wurde automatisch übersetzt. Es kann daher zu Abweichungen oder Ungenauigkeiten im Text kommen. Verbindlich ist ausschließlich die Originalfassung. Rechtsansprüche aus Inhalten der übersetzten Version sind ausgeschlossen.

Building project; notification of commencement of use

Service content

  • Description of the

    The notification of commencement of use is not an application. You simply need to inform the lower-level building control authority of the forthcoming commencement of use.

    The notification of commencement of use is intended to ensure that the lower-level building control authority still has sufficient time to verify that the conditions for occupancy are met, if necessary.

    Consequences of non-disclosure

    If you fail to give at least two weeks’ notice of commencement of use, whether intentionally or through negligence, you are committing an administrative offence. You may be liable to a fine of up to 500,000 EUR.

  • Prerequisites

    You must notify the authorities of the commencement of use of a building if it was constructed either under a planning permission or as an exempt development. This also applies if the planning permission or exemption from planning permission merely involved a change of use, or if the planning permission is deemed to have been granted due to the application of the ‘deemed consent’ rule.

    You do not need to submit a notice of commencement of use for projects not subject to formal procedures, or for projects that do not require planning permission because other authorisation procedures take precedence.

  • Deadlines

    You must give notice of the commencement of use at least two weeks in advance.
  • Required documents



    Where applicable, Structural Stability Certificate II (see ‘Forms’ for the form)
    Required only for buildings in building classes 4 and 5.

    Where applicable, Fire Safety Certificate II (see ‘Forms’ for the form)

    Only required for special structures, medium-sized and large car parks, and buildings in building class 5, unless the fire safety certificate has been verified by the building control authority.

    Where applicable, fire safety certificate

    Only if it has not been verified by the building control authority.

    Where applicable, confirmation by an authorised certifying body that the construction work complies
    with the fire safety certificate. Only required for buildings in building class 4, except for special structures and medium-sized and large car parks.
  • Forms

  • Costs

    none
  • Legal basis

  • Legal remedy

    As no decision is issued by the lower building supervisory authority, you cannot lodge an appeal.
  • Further links

  • Procedure

    Written submission

    • Submit the completed and signed ‘Notification of Commencement of Use’ form, together with the required supporting documents, to the local building control authority (district offices, independent cities, major district towns and certain larger municipalities).
    • Verbal notification is not sufficient.
    • You will not receive a confirmation of receipt.
    • The lower-level building control authority will then, where necessary, check whether the conditions for occupancy have been met.

    Digital submission

    It is not yet possible to submit a notification of commencement of use digitally throughout Bavaria. When you select a location, a link to the online procedure will appear, provided that this service is already available.

    • The commencement of use can be notified digitally to the lower building control authority using the online wizard.
    • The standard ‘Notification of Commencement of Use’ form is replaced by the questions in the online wizard.
    • Signatures are replaced by authentication using the "BayernID" user account or "My company account".
    • The attachments are uploaded in electronic form (PDF files) via the online wizard.
Please note that the texts on the services are published by the Bavarian State Ministry for Digital Affairs and can only be supplemented by us.

Responsible departments

Help with accessibility

  • General

    We endeavour to make our website accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view

Select language