Small wastewater treatment plant; transmission of confirmation of proper installation

Service content

  • Description of the

    Before a small-scale sewage treatment plant (KKA) is commissioned, a construction inspection must be carried out in accordance with water legislation once it has been completed. To this end, the client commissions a private water management expert (PSW). During an on-site inspection, the PSW confirms to the relevant authority that the small-scale sewage treatment plant has been constructed in accordance with the water law permit. If there are any discrepancies between the installed plant and the approved small-scale sewage treatment plant, these are identified by the PSW on site and described in the construction acceptance report.

  • Prerequisites

    The appointed private expert must be accredited by the Bavarian State Office for the Environment for the accreditation area ‘small-scale sewage treatment plants and septic tanks’ in accordance with the Regulation on Private Experts in Water Management (see ‘Further Links’).

  • Deadlines

    The building handover report must be drawn up:

    • upon completion (including proof of watertightness)
    • before the plant is commissioned
  • Required documents


    Photos
    Photos must be uploaded to document the location, the installed system and, where applicable, any deviations.
  • Costs

    The private water management expert invoices the operator of the small-scale sewage treatment plant for their services. No further costs are incurred by the authorities.

  • Legal basis

  • Legal remedy

    none
  • Further links

  • Procedure

    The construction acceptance report is to be drawn up digitally by a recognised private expert in water management (PSW) and submitted to the relevant authority via an online procedure.

    • The online procedure may only be used by a recognised private expert in water management (PSW). The accreditation number must be provided.
    • The PSW must confirm that it has been commissioned by the client.
    • Upon dispatch, a data record is transmitted electronically to the relevant authority for further processing in its own local authority software programmes.
    • A PDF file can also be generated and sent by the system.
    • The authority then formally completes the building inspection in accordance with water law, without informing the PSW or the operator.
    • The PSW files the content submitted via the online procedure in its project file as a summary (a log in PDF format) for documentation purposes. It also sends this file to the operator for inclusion in the operator’s logbook.
  • Processing time

    There is neither a statutory processing time limit nor a formal requirement for the authorities to complete the final inspection of the works. The authorities will take action in respect of any discrepancies identified and described by the PSW between the installed small-scale sewage treatment plant and the planned or approved one.

Please note that the texts on the services are published by the Bavarian State Ministry for Digital Affairs and can only be supplemented by us.

Responsible departments

Help with accessibility

  • General

    We endeavour to make our website accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view

Select language