Service content
Description of the
Construction projects not subject to planning permission are those that do not require planning permission. You may carry out the building work provided that there is no moratorium on alterations.
However, for your construction project that does not require planning permission, you may be granted an exemption from the moratorium on changes to ensure compliance with town and country planning regulations, provided that there are no overriding public interests to the contrary. The planning authority will decide, in consultation with the local council, whether to grant your exemption.
Examples of matters of public interest:
- Monument protection
- Nature conservation
- Environmental protection
- Townscape and landscape
The following may be affected by a change freeze:
- Construction, alteration or change of use of buildings,
- Large-scale earthworks and excavations,
- Excavations, deposits, including mineral deposits,
- Demolition of buildings
- significant or substantial improvements to land and buildings, provided that these are not subject to planning permission, approval or notification.
The following are not affected by the freeze on changes:
- Projects for which planning permission was granted before the moratorium on changes came into force.
- Projects of which the local authority is aware and on which work could have begun before the planning freeze came into force.
- Maintenance work and the continuation of an existing use.
For construction projects
- in officially designated regeneration areas or
- within the urban development area
Different regulations apply to building projects affected by a moratorium on changes designed to safeguard urban land-use planning. In such cases, the building project must have been granted planning permission by the local authority.
Prerequisites
Addendum for the whole of Bavaria
You are planning a building project on a plot of land that does not require planning permission, but which is currently subject to a moratorium on changes to safeguard the local development plan.
Deadlines
Addendum for the whole of Bavaria
noneCosts
There are no costs involved.
Legal basis
Legal remedy
- Objection
Procedure
Addendum for the whole of Bavaria
You must apply to the relevant local authority for an exemption from the moratorium on changes to ensure compliance with the local development plan.
Notes
There are no notes or special points to note.