Traffic can still flow. Part of the gravel car park will be converted into a temporary diversion route. Potholes will be filled in and the surface prepared so that cars can drive in two lanes without any problems. The temporary diversion will be in place from 7 September to 2 October. During this period, around 25 parking spaces will be unavailable.
Construction site
